Skip to content
123 Construction AZ logo
Demo to Final Fixture

Bathroom Remodel Contractor in Phoenix, AZ

Almost every failed bathroom we are called to repair failed at the waterproofing, not the tile. It is the one part of the job nobody sees once it is finished, and the only part that decides whether the room lasts.

01

The part of the job you will never see

A shower is a controlled leak. Water gets behind the tile by design, and the membrane underneath is what carries it back to the drain. When that membrane is installed badly, or penetrated afterwards by a niche cut in the wrong order, the failure does not show for a year or two, and by then it is inside the framing.

We flood-test pans before any tile goes on. It is an unglamorous step that adds a day, and it is the difference between a bathroom that lasts twenty years and one that is opened back up in year three.

Because we hold the plumbing license (CR-37, ROC #321444) and set the tile ourselves, the person installing the membrane answers to the same license as the person who set the drain it ties into.

02

What it costs and what moves the number

Every competitor says it depends. Here is what it actually depends on. A guest bath refresh in the existing footprint is the low end. Moving supply and waste lines to change the layout is the first real step up, because it means opening the floor and, in a single-storey slab home, cutting concrete.

The second is glass. A frameless enclosure is templated after tile, has a multi-week lead time, and costs a multiple of a framed door. The third is stone: a large-format slab wall or a book-matched surround changes both the material cost and the labour to set it.

We publish a range with the quote and we name which of those three variables is driving it, so you can move the number deliberately rather than discovering it in a change order.

Finished Builds

Work Like This

View All Projects
Freestanding Tub Suite: Primary bath with a freestanding soaking tub, navy vanity and a floor-mount filler, set by master plumbers in-house.
BathsFreestanding Tub Suite
Marble Double Vanity: Book-matched slab vanity with backlit mirrors and a frameless glass enclosure beyond.
BathsMarble Double Vanity
Tiled Shower & Niche: Full-height tile with a recessed niche and a linear mosaic band. Waterproofing and setting self-performed.
BathsTiled Shower & Niche
Spa Shower & Tub: Large-format porcelain wet area pairing a soaking tub with a walk-in shower and backlit mirror.
BathsSpa Shower & Tub
FAQ

Common Questions

01
How long does a bathroom remodel take in Phoenix?
Three to five weeks for a guest bath, six to nine for a primary suite with a wet room and custom glass. Glass and fixture lead times, not labour, usually set the outside edge.
02
Can you move the toilet or shower to a different wall?
Yes, though in a slab-on-grade home it means cutting and re-pouring concrete to move the waste line. That is a real cost step, so we price it explicitly rather than folding it into a lump sum.
03
Do you handle the permits?
Yes. Relocating plumbing or electrical requires a permit in most Valley jurisdictions, and we pull and coordinate it as part of the contract.
Get In Touch

Get a free bathroom remodel quote

We will give you a range, and tell you exactly what moves it.