
Bathroom Remodeling
Primary suites, guest baths and powder rooms, taken from demolition through tile, glass and fixture setting. Waterproofing and setting are self-performed, because that is the detail that decides whether the room lasts.
Where Waterproofing Decides Everything
Primary suites, guest baths and powder rooms, taken from demolition through tile, glass and fixture setting. Waterproofing and setting are self-performed, because that is the detail that decides whether the room lasts.
Almost every bathroom failure we are called to repair traces back to waterproofing rather than to the tile on top of it. A shower pan that was not tested, a curb that was not sealed, a niche cut after the membrane went on: none of it is visible once the tile is set, and all of it surfaces two years later.
We self-perform both the plumbing (CR-37, ROC #321444) and the tile setting, so the membrane is installed and flood-tested by people who answer to the same license as the plumber who set the drain.
Typical scope covers demolition to studs, relocating supply and waste for a new layout, framing niches and benches, waterproofing and flood testing, large-format or mosaic tile, glass measurement and installation, vanity and fixture setting, and final adjustment.
A guest bath generally runs three to five weeks. A primary suite with a wet room, freestanding tub and custom glass runs six to nine. Fixture and glass lead times, not labour, set the outside edge of that range.
- 01Waterproofing self-performed
- 02Master plumbers in house
- 03Large-format & mosaic tile
Recent Work
InteriorsLinear Fireplace Living
InteriorsFloating Stair & Glass Rail
InteriorsEntry Volume
The crew that roughs it in answers to the same license you hired.
Everything ElseWe Self-Perform
Requestan Estimate
We are currently accepting new residential contracts for the upcoming season. Fill out the form to schedule a consultation with our project management team.
